Which States Qualify?

Check where balcony plug-in solar has a signed pathway, where bills are moving, where proposals stalled, and where no dedicated bill was identified. Enactment and permission to install a particular product are different questions.

Nationwide review: November 4, 2026. Individual evidence dates appear in state details; some official records remain unconfirmed. Not legal advice.

Your state

Check by IP when you ask

This page can estimate your state from your public IP after you click Detect my state, then explain the tracked status. The lookup is optional and can be bypassed with the dropdown.

Choose a state or use Detect my state.

Plug-in solar rules can depend on state law, local code, product listings, utility tariffs, interconnection exemptions or forms, export limits, and landlord or HOA rules. Check the applicable utility notice process and local authority's installation requirements before connecting equipment.

Policy update

Recent balcony solar policy developments

Green means enacted, including laws with future effective dates. Yellow means pending; blue-gray means stalled or a next-session watch item. None of these colors approves an installation.

Ten states have enacted pathways.

California, Utah, Colorado, Connecticut, Maine, Maryland, New Hampshire, New Jersey, Vermont, and Virginia are marked green because a signed pathway is tracked. Some still have future effective dates or phased implementation, so buyers should confirm current utility and code guidance.

Device placement and electrical work have different rules.

The pathway starts March 1, 2027. DCA's Fall 2026 guidance explains that the device-placement exemption does not remove permits for related building or electrical alterations, such as adding an outlet. Read DCA's guidance.

SB 868 is signed; the pathway starts in 2027.

Governor Newsom signed SB 868 September 30. Starting January 1, 2027, qualifying systems can use a utility interconnection exemption, with up to 1,200W aggregate AC per dwelling, plug-in-system certification, code compliance and outage isolation. See the requirements.

Two major markets remain close but unfinished.

New York's SUNNY Act passed both chambers May 28; no governor action is recorded in the checked history. Massachusetts H5175/S3166 remains in conference; the official conference table lists July 20 receipt and no conference report.

A committee markup is scheduled, not a law.

The Council's notice schedules consideration and a vote on the GRID Amendment Act for November 4 at 2:15 p.m. Eastern. A scheduled meeting does not establish that a vote occurred. The proposal remains under Council review, with no final passage or official law recorded. Check the Council record.

A bill in Congress is not nationwide permission.

H.R. 10851, the Socket Full of Sunshine Act, was introduced October 19 and referred to House Energy and Commerce. It proposes requiring state regulators to consider a plug-in solar standard, plus a rebate program. It is not enacted; it creates no current nationwide installation exemption or available rebate. Read the introduced bill.

A study resolution is not an installation exemption.

SR21 requests a safety and billing study, with a report by January 26, 2027. The Senate passed it June 24. SB270's proposed portable-solar exemption remains unenacted in committee. Read the resolution.

Pending is different from enacted.

Michigan HB5764, North Carolina HB1129 and Ohio HB755 remain committee proposals, not enacted exemptions. West Virginia HB5648 contained portable-solar provisions but stalled after a committee-discharge motion was tabled. New Mexico SB157 is recorded as dead.

Certification and utility notice are still the pressure points.

UL 3700, anti-islanding, outlet protection, rapid shutdown, equipment listings, and simple utility notification are the issues most likely to shape final state rules and product choices.

Effective laws still have different installation paths.

Maine's law took effect July 29: above 420W AC, it requires a licensed electrician, a dedicated single-outlet circuit and notice, up to 1,200W. Connecticut's portable-solar exemption took effect October 1. California's cap is not a nationwide installation rule.

Virginia's customer notice form is available for 2027.

Both utility exemptions start January 1, 2027. Virginia's SCC has posted Form SPGDN, marked effective that date. Send sections 1-4 to your utility before installation and resolve any deficiencies, or allow 15 days without a response, before proceeding. Get Virginia's notice form (PDF). New Hampshire allows utilities to request wattage notice after installation; its building-code changes have a separate standards trigger. Certification and local installation requirements still apply.

Status map

Tracked state status

Enacted Pending Stalled Banned No bill found

Selected state

Select a state to check status

Use the map, dropdown, or IP detector to see the current BalconyWatt tracker note.

Pending legislation

Where active bills sit in the cycle

Chamber passage, reconciliation, executive action and stalled proposals are shown separately. A stalled bill may return in a new session, but it must advance again before it can change the law.

State list

All tracked jurisdictions

State Status Bill Stage Tracker note

Method

How we check state rules

National trackers help us discover proposals; official legislative histories and enacted text support status changes. The selected-state panel shows evidence dates and records that still need confirmation. Inconclusive searches and unavailable records keep their earlier evidence dates. No-bill and no-ban findings do not override electrical codes, utility tariffs or property rules.