State count
Ten states have enacted pathways.
California, Utah, Colorado, Connecticut, Maine, Maryland, New Hampshire, New Jersey, Vermont, and Virginia
are marked green because a signed pathway is tracked. Some still have future effective dates
or phased implementation, so buyers should confirm current utility and code guidance.
New Jersey
Device placement and electrical work have different rules.
The pathway starts March 1, 2027. DCA's Fall 2026 guidance explains that the device-placement
exemption does not remove permits for related building or electrical alterations,
such as adding an outlet.
Read DCA's guidance.
California
SB 868 is signed; the pathway starts in 2027.
Governor Newsom signed SB 868 September 30. Starting January 1, 2027, qualifying systems
can use a utility interconnection exemption, with up to 1,200W aggregate AC per dwelling,
plug-in-system certification, code compliance and outage isolation.
See the requirements.
New York and Massachusetts
Two major markets remain close but unfinished.
New York's SUNNY Act passed both chambers May 28; no governor action is recorded in the checked history.
Massachusetts H5175/S3166 remains in conference; the official conference table lists
July 20 receipt and no conference report.
District of Columbia
A committee markup is scheduled, not a law.
The Council's notice schedules consideration and a vote on the GRID Amendment Act
for November 4 at 2:15 p.m. Eastern. A scheduled meeting does not establish that a vote
occurred. The proposal remains under Council review, with no final passage or official law recorded.
Check the Council record.
Federal proposal
A bill in Congress is not nationwide permission.
H.R. 10851, the Socket Full of Sunshine Act, was introduced October 19 and referred to
House Energy and Commerce. It proposes requiring state regulators to consider a plug-in
solar standard, plus a rebate program. It is not enacted; it creates no current nationwide
installation exemption or available rebate.
Read the introduced bill.
Delaware
A study resolution is not an installation exemption.
SR21 requests a safety and billing study, with a report by January 26, 2027.
The Senate passed it June 24. SB270's proposed portable-solar exemption remains
unenacted in committee.
Read the resolution.
Committee proposals
Pending is different from enacted.
Michigan HB5764, North Carolina HB1129 and Ohio HB755 remain committee proposals,
not enacted exemptions. West Virginia HB5648 contained portable-solar provisions but stalled
after a committee-discharge motion was tabled. New Mexico SB157 is recorded as dead.
Safety standards
Certification and utility notice are still the pressure points.
UL 3700, anti-islanding, outlet protection, rapid shutdown, equipment listings, and simple
utility notification are the issues most likely to shape final state rules and product choices.
Maine and Connecticut
Effective laws still have different installation paths.
Maine's law took effect July 29: above 420W AC, it requires a licensed electrician,
a dedicated single-outlet circuit and notice, up to 1,200W. Connecticut's portable-solar
exemption took effect October 1. California's cap is not a nationwide installation rule.
Virginia and New Hampshire
Virginia's customer notice form is available for 2027.
Both utility exemptions start January 1, 2027. Virginia's SCC has posted Form SPGDN,
marked effective that date. Send sections 1-4 to your utility before installation and
resolve any deficiencies, or allow 15 days without a response, before proceeding.
Get Virginia's notice form (PDF).
New Hampshire allows utilities to request
wattage notice after installation; its building-code changes have a separate standards trigger.
Certification and local installation requirements still apply.